Beacon
Maritime's project history is a testimony of our personnel's
experience, talent and capacity to execute complex construction
and repair projects. Many of our employees have been in the
marine fabrication and shipbuildling industry for over
40 years, having started with Levingston Shipbuilding in Orange,
Texas in the 1960's. Their ship building traditions continue
today with Beacon Maritime.
Our philosophy in founding the company was
that companies are built around people. Talented and experienced
personnel are the back bone of Beacon Maritime and have historically
been where we place our resources.
CLIENT |
PROJECT DESCRIPTION |
CLASSIFI-CATION |
BEACON
ROLE |
PROJECT
YEAR |
| OANDO "Respect" |
Drill Barge Reactivation |
ABS/MODU |
Prime |
2012
(in Progress) |
| Anadarko Lucius Platform Quarters Structure |
Engineering, procurement and construction of 44 POB
accommodations for SPAR |
ABS/MODU |
Prime |
2012
(in Progress) |
| HERCULES 150 |
Major leg repair. Realigned damaged leg; replaced 54
baffles; replaced 15 horizontals and diagonals |
ABS/MODU |
Prime |
2012 |
| NABORS OFFSHORE POOL 54 |
Major hull repairs |
ABS/MODU |
Prime |
2011 (in Progress) |
| SHELL OLYMPUS PLATFORM/ NABORS OFFSHORE |
Fabricate beams and drilling package modules |
ABS/MODU |
Prime |
2011 (in Progress) |
| CONOIL/BETTER GOLD NIGERIA MOPU 155 |
Conversion of MOPU to cantilever MODU, repairs and upgrade |
ABS/MODU |
Prime |
2011 (in Progress) |
| SAMSUNG/ |
Fab leg cornerposts for Super M2 new build jack-up (2)
Shipsets |
ABS/MODU |
Sub-Contract |
2011 (in Progress) |
| MAERSK DEVELOPER / MODU |
Fab and install stair tower, trolley beams, boom rest
and various piping spools |
ABS/MODU |
Prime |
2010 |
| WALLER MARINE |
Fab machinery House |
ABS/MODU |
Prime |
2010 |
| SPARTAN R202/ MODU |
Fab and install leg inserts |
ABS/MODU |
Prime |
2010 |
| HERCULES R251/ MODU |
Repair cracks in legs |
ABS/MODU |
Prime |
2010 |
| BP MAD DOG |
Fab and outfit office extension module for SPAR |
ABS/MODU |
Sub-Contract |
2010 |
| AHL TANKERS |
Fab large power and hull modules |
ABS/MODU |
Sub-Contract |
2009 |
| PRIDE ARKANSAS/MODU |
Install hull inserts and miscellaneous work on rig in
Mexico |
ABS/MODU |
Prime |
2009 |
| HMC HEEREMA |
Various barges repair topsides |
|
Prime |
2009 |
| HERCULES 185/ MODU |
Install 100' of Beacon fabricated leg on-site in West
Africa |
ABS/MODU |
Prime |
2009 |
| SPARTON 208/ MOPU |
Conversion of MOPU to cantilever MODU, mat repairs and
upgrade |
ABS/MODU |
Prime |
2009 |
| PRIDE LOUISIANA/ MODU |
Install leg inserts and hull repairs |
ABS/MODU |
Prime |
2009 |
| NOBLE LEWIS DUGGER/ MODU |
Fab crane column and associated ladders platforms and
handrails in Mexico |
ABS/MODU |
Prime |
2009 |
| HERCULES 185/ MODU |
Fab 100' of leg for replacment of damaged leg Donhaiser
Marine design |
ABS/MODU |
Prime |
2008 |
| NOBLE PERCY JOHNS / MODU |
Fab crane column and associated ladders platforms and
handrails in Mexico |
ABS/MODU |
Prime |
2008 |
| REMEDIAL OFFSHORE/ MODU |
Fab cantilever beams for new build jack-up |
ABS/MODU |
Prime |
2008 |
| NOBLE SAM NOBLE/ MODU |
Fab crane column and associated ladders platforms and
handrails in Mexico |
ABS/MODU |
Prime |
2008 |
| COSCO/ REMEDIAL OFFSHORE |
Fab leg cornerposts for Super M2 new build jack-up |
ABS/MODU |
Prime |
2008 |
| KCA / CHEVRON NIGERIA |
55 POB New build Living Quarters modular
package / Platform Rig |
|
EPC Contract |
2007 |
| KCA TELLUS/ MODU |
Major upgrade and hull repairs, systems repairs, accommodations
refurbishment |
ABS/MODU |
|
2007 |
| TODCO 206 / MODU |
Mat to leg connections survey and
repairs in Progreso, Mexico |
|
|
2007 |
| KCA NEPTUNE / MODU |
96 POB Living Quarters restoration, New build Legs,
Take in the key, new build cantilever, Drill package installation,
commissioning
Hull sponson additions, Spud Cans |
ABS/MODU |
Prime |
2007 |
| NABORS DOLPHIN 109 / MODU |
Gear rack replacement, hull repair |
ABS/MODU |
Prime |
2006 |
| PARKER / MODU |
Mud module fabrication |
ABS/MODU |
Prime |
2006 |
| SONGA JUPITER / MODU |
100 POB New build Living Quarters,
F&G 0 to Mod II conv new build truss leg extensions,
new cantilever beams, drill floor re-power, drill package
installation, helideck |
ABS/MODU |
Prime
EPC Contract |
2006 |
| ABAN VII / MODU |
Cantilever conversion |
ABS/MODU |
EPC Contract |
2006 |
| PEMEX / NABORS |
64 POB accommodations module, 2 galleys,
helideck |
|
EPC Contract |
2005 |
| UMAX / THUNDERHORSE |
Jumper transport stations, weld mapping, NDT, D1.1 |
|
Sub-contract |
2005 |
| RBF / MODU |
16 POB New build Living Quarters module |
ABS/MODU |
EPC Contract |
2004 |
| EL PASO CAMERON HWY |
6 POB Living Quarters, Comm, Helideck, New Build / Production
Platform |
ABS/MODU |
EPC Contract |
2004 |
| NABORS |
Living quarters refurbishment |
ABS/MODU |
|
2004 |
| ENSCO / MODU |
Mud lab |
ABS/MODU |
EPC Contract |
2003 |
| GLOBAL SANTEFE / MODU |
High Pressure mud line replacement |
ABS/MODU |
Prime |
2003 |
| EL PASO FALCON'S NEST |
12 POB Living Quarters, additions & refurbishment
/ Production Platform MCC additions & integration,
A60 stairwell addition, helideck |
ABS/NO CERT |
EPC Contract |
2003 |
| ENSCO / MODU |
8 POB New build Living Quarters module |
ABS/MODU |
EPC Contract |
2003 |
| RBF / MODU |
16 POB New build Living Quarters module |
ABS/MODU |
EPC Contract |
2003 |
| BLAKE / MODU |
Column leg repairs, pin hole inserts, hull repairs |
ABS/MODU |
Prime |
2003 |
| TODCO 206 / MODU |
Drydock, hull, mat, skirt repair |
ABS/MODU |
Prime |
2003 |
| NABORS WORKHORSE 9 / MODU |
Bottom hull replacement |
ABS/MODU |
Prime |
2003 |
| ENAP |
MCC Platform control center + shelter in place / Production
Platform |
ABS |
EPC Contract |
2002 |
| ENSCO / MODU |
Living quarters upgrade, rig 83 |
ABS/MODU |
Prime |
2002 |
| ENSCO / MODU |
16 POB New build Living Quarters module |
ABS/MODU |
EPC Contract |
2002 |
| CHILES / MODU |
8 POB New build Living Quarters module |
ABS/MODU |
EPC Contract |
2001 |
| Horzon Pecos / Lay Barge |
130 POB LQ Total Restoration after Asbestos Abatement |
ABS/USCG |
Prime |
2001 |
| Horizon Pacific / Lay Barge |
98 POB LQ Total Restoration after Asbestos Abatement |
ABS/USCG |
Prime |
2001 |
| CHILES / MODU |
On Board electrical modifications, fire & gas system
installation |
ABS/MODU |
Prime |
2001 |
| Horizon Canyon / Lay Barge |
101 POB LQ Total Restoration after Asbestos Abatement |
ABS/USCG |
Prime |
2000 |
| Horizon Lone Star / Lay Barge |
180 POB LQ Total Restoration after Asbestos Abatement |
ABS/USCG |
Prime |
2000 |